Wind Management Plan
First published 22nd Apr, 2020All events should have wind management plan listing the maximum wind speed for each structure and the action to be taken at 60% and 80% of the maximum wind load capacity.
The plan must be monitored by a competent person against the operating limits of each of the temporary structures. Effective action must be taken before any operating limits are exceeded.
See Weather
All event guidance