Wind Management Plan

First published 22nd Apr, 2020

All events should have wind management plan listing the maximum wind speed for each structure and the action to be taken at 60% and 80% of the maximum wind load capacity. 

The plan must be monitored by a competent person against the operating limits of each of the temporary structures.  Effective action must be taken before any operating limits are exceeded.

See Weather

All event guidance